| Deployment | Description | Dates | Geographic Extent |
|---|---|---|---|
| dfo-bumblebee998-20260717 | Calvert Line. Thruster installed. Built-in O2 inoperative. External O2 sensor installed; set to 10 s sampling hoping to last three weeks; will turn on 7 Aug. Going around south side of Calvert Island to compare with Maria mission. | 20260717T170911 20260801T033528 | 50.899 51.760 N -130.465 -127.845 E |